Recent rumours about Kariba being overfull and in danger of collapse are nonsense
Terry began his talk by announcing that recent rumours about
River flows: http://www.zaraho.org.zm/flows.html
Â
He affirmed that the dam is in no danger of imminent collapse. His presentation, based on a variety of sources include the Zimbabwean and Zambian power authorities, the Zambezi River Authority (ZRA) and a number of highly respected experts worldwide, was, he said, to dispel rumours and to assure people that Kariba Dam, throughout its 50 year history, has been regularly inspected for safety and thoroughly monitored both locally and by international consultants, who have found it to be in a very sound state.
Â
Safety inspections & maintenance
Twice yearly inspections and surveys are carried out on Kariba Dam and every 5 years a special safety inspection is undertaken with experts from French and
Â
Continuous annual maintenance is carried out on the dam, especially on mechanical parts such as the spill gates and stop locks.Â
Â
There are literally hundreds of instruments in the wall which measure stress, any changes or movement in the wall, water pressure, drainage etc. These are continually inspected, have survived the past 50 years remarkably intact and are still functioning well. (For example, of the 263 original strain meters buried in the concrete of the dam to measure stress in three dimensions, 214 are still operating perfectly).
Â
In 1997, the World Bank commissioned a special investigation of Kariba Dam prior to giving the go-ahead for the construction of the North Bank (Zambian) power station. A very thorough and extremely sophisticated computer-based analysis was carried out by international experts and Kariba was given a clean bill of health and declared quite safe!
Â
The total catchment area of
Â
The dam’s usual spill rate per floodgate is 1500 cubic metres per second (cumecs). At capacity each gate spills 9000 cumecs. However, the dam was constructed to withstand much greater flows than this… indeed at the height of the 1956 great flood, 16 000 cumecs were recorded! Overtopping of the dam itself, although catastrophic for downstream communities and damaging to the electrics inside the wall, would not necessarily result in collapse of the dam.
Â
The Zambezi River Authority prefers to control the water-level to a maximum operating level of 1 metre below the roadway on top of the wall – to prevent overtopping and electrical damage. Although the dam has 6 floodgates, they prefer, for various reasons to do with stress levels and potential undercutting, to restrict the spill to 3 open floodgates.Â
Â
An operational mistake in 1997/8 resulted in a potentially dangerous situation because ZRA did not lower the lake level from October as usual. Fortunately the floods that rainy season were not huge and they were able to get away with it.
Â
Challenges
1. The south bank of the Kariba Gorge downstream of the dam has been a problem from the time the dam was built. Although the wall is deeply imbedded into the deep-down solid natural rock of the hillside and has been heavily reinforced by buttresses, the top 30 metres of the hillside is composed of a rock which is weak and has tended to slip – a factor which was exacerbated when the hillside was saturated by rain or spray from the open floodgates. This was a potentially dangerous situation as land slippage could have blocked the dam’s underground tunnels. Various measures have been taken since 1978 to stabilize the bank and prevent slip, including the construction of drainage channels. These have been successful. Careful monitoring continues, but it appears that the bank is no longer a danger.
Â
2. Spillway and stop beams – there is mechanical and electrical equipment involved with these, which can give trouble if not properly maintained. The dam was originally designed with just 4 spillway gates each approx. 9 sq m in size. Two more were added after the big floods of 1956 during construction of the dam. Regular testing is carried out on the gates and the hoist mechanism which lifts and closes them. Many people do not realize that the dam wall is sealed only on the downstream side, with the interior being water-filled. The presence of water can cause problems with mechanical and electrical parts and deposits on the concrete surrounding the gates sometimes needs to be removed in order for the mechanism to slide correctly. There is also a recent issue of concrete swelling (see below) which requires attention if it threatens to impede the gate mechanisms. In 1998 a complete refurbishment of the dam’s electrics was undertaken, with wire cables being replaced and a stand-by generator provided in case of power failure.Â
Â
3. Concrete swelling
Extra instrumentation was installed and it has been discovered that the crest of the dam is 80mm higher today than when it was first built! Arch dams like Kariba are naturally a little flexible, and it has been noticed that when the lake levels are low, the dam moves up to 50mm upstream and then back downstream again when it fills! Furthermore, the dam now tilts slightly (about 10mm) off the vertical in an upstream direction.
Â
One of the problems associated with this is that it can affect the spillgates, stoplocks and moveable parts. These have to be checked regularly and maintenance carried out (e.g. chipping away of concrete) to ensure that they move freely.
Â
4. Seismic Activity (earthquakes)
Â
In 2001, a study of the Kariba area to check seismicity was undertaken by experts. Four separate seismograph stations were erected at a distance of some 20 kms away from the dam to map seismic activity, which appears to have been decreasing in recent years. No damage due to seismic activity was seen, even on the problematic South Bank.Â
Â
5. The “plunge pool†(below the floodgates)
Â
In the first 20 years of the dam’s history, there was considerable spillage through the floodgates, which which led to the creation of the pool. Between 1982 and 2000, the floodgates were not used, due to low lake levels. Since 2000, the gates have been used very little because of power generation on both the Zimbabwean and Zambian sides of the river.
Â
Currently, engineers are concerned that the plunge pool should not be allowed to scour any deeper and that any cut-back or erosion upstream should be avoided, as this would undermine the foundations of the dam. The pool has been the subject of number inspections (some with divers) and surveys (the latest in 2001) and the profile of the pool has been fully mapped. Repairs to soft spots have been undertaken using underwater concrete. If the dam is allowed to spill in the next year, the subsequent effects on the plunge pool will be checked and restoration work will be undertaken.
Â
6. Concrete apron at the foot of the dam
Â
7. Reinforcing steel within the dam
Â
The examples above were given to show the extent to which the authorities ensure that maintenance and corrective measures are undertaken to protect the dam and ensure its safety.
Â
Summary of possible threats
- Ageing and corrosion. There are many examples of dams which have existed for hundreds of years. The evidence from inspections so far indicate that Kariba dam is remarkably free of corrosion and is ageing extremely well
- Overtopping. If this were to occur, it would cause damage and chaos downstream, but it would not necessarily cause the dam to collapse
- Undermining of the foundations. This is a real threat, but, as outlined above, regular inspections and protective measures and maintenance ensure that the likelihood of this happening is reduced.
- Swelling of concrete. This is being carefully monitored and corrective measures taken.
- Earthquake. A very big earthquake could affect the dam. But it has been designed to withstand such an event. Most of the seismic events recorded have been small and the indications are that activity has decreased in recent years.
Â
Funding and personnel
The costs of maintaining the dam wall are born by the governments of
Â
The safety of Kariba dam ultimately depends on people. In the 2005 report on Kariba Dam, the expert consultants wrote this paragraph about the numerous staff responsible for the dam:Â
“In the consultants’ very wide experience of other dams in many countries, it is rare to find such an experienced, stable, dedicated, friendly and unified teamâ€.